Friday, January 8, 2016

Things Done So Far

After three months of ownership:
Burst pipes repaired by plumber, some copper replaced with PEX.
Slate roof repaired by roofer.
Cleaned whole house. Everything but the basement. Walls washed, floors mopped, Inside of all of the many cupboards on the first floor painted.
Guts to first floor toilet replaced.
Dozens of light bulbs replaced.
Head to shower replaced.
One valve stem to tub replaced.
Some of the holes in attic ceiling patched.
Vent to shower replaced.
Drain to washing machine repaired (with LH), Washer and Dryer installed.
Light fixture in the back yard repaired (with LH).
Electrical wiring in attic replaced by LH.
Mold eliminated from basement stairs.
Water line to ice maker on fridge repaired.
Pool pump and lines emptied and moved in doors for the winter.
Fence pulled into more upright position and cemented in place.